Railways

Zemun Polje – Nikola Tesla Airport – National Stadium railway

New double-track electrified passenger line from Zemun Polje to Belgrade's Nikola Tesla Airport and the National Stadium at Surčin, part of the infrastructure for EXPO 2027. It is 18.3 km long, designed for up to 120 km/h, with stops at Singidunum, the airport and Surčin and a station at the National Stadium. The contractor is PowerChina International Group.

Total length
18 km
Open today
0 km
Under construction
18 km
Sections
1
Loading map data…

Sections

Sections of Zemun Polje – Nikola Tesla Airport – National Stadium railway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Zemun Polje – Nikola Tesla Airport – National Stadium

New double-track electrified line, 18.3 km (MGSI gives 7.1 km Zemun Polje–Singidunum, 3.7 km to the airport, 3.1 km to Surčin and 3.8 km to the National Stadium). The minister toured the site with workers on 2 May 2025 (MGSI), so construction had started by May 2025; Novosti reported the start on 14 June 2025. The month is recorded as the latest possible start. MGSI states a total contract value of EUR 188.1 million; the contract date and price year are not given, VAT treatment is not stated, and the figure is not recorded as an award revision. The contract was agreed directly under the Serbia–China agreement on economic and technical cooperation in infrastructure. The expected opening is the contracted works deadline of end 2026 stated by the minister, not a passenger opening date; delivery of nine new electric trains was expected from November to March. MGSI counts seven structures on the line (three bridges, two underpasses, two overpasses) while another ministry report counts six (four bridges, a viaduct and an overpass). Geometry is the OpenStreetMap railway=construction ways of one track, 17.9 km as drawn against 18.3 km recorded. The recorded length is the sourced figure.

Under construction18 km
  1. May 2025Construction start
  2. Dec 2026Expected opening
––
  • PowerChina International Group LimitedBuilder
Contract value €188.1M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. MGSI: Izgradnja železničke pruge od Zemunskog polja do Nacionalnog fudbalskog stadiona u Beogradu (project page)read Oct 5, 2026
  2. MGSI: Sofronijević: Radovi na pruzi Zemun polje-Nacionalni stadion odlično napredujuread Oct 5, 2026
  3. MGSI: Sofronijević: Radovi na pruzi Zemun Polje - Nacionalni stadion teku planiranom dinamikomread Oct 5, 2026
  4. Novosti: Započeta izgradnja pruge Zemun Polje – Aerodrom Nikola Tesla – Nacionalni stadion (14 June 2025)read Oct 5, 2026
  5. OpenStreetMap contributors (geometry, ODbL): railway=construction ways Zemunsko polje - Aerodrom - Surcin - Eksporead Oct 5, 2026