Skip to content
InfraWorldWide
← All projects
Railways

Raide-Jokeri light rail, line 15

A 25 km light-rail line between Itäkeskus in Helsinki and Keilaniemi in Espoo. Construction began in June 2019 and passenger service began on 21 October 2023. The Helsinki and Espoo infrastructure outturn was reported as EUR 382 million, including a warranty-period reserve.

Total length
25 km
Open today
25 km
Sections
1
Cost for the project as a whole
€382MThe reported infrastructure outturn includes a EUR 7 million reserve for costs during the warranty period. The depot outturn of EUR 63 million and EUR 67.5 million of related works are separate. The source does not state a price year.
Loading map data…

Sections

Sections of Raide-Jokeri light rail, line 15: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Itäkeskus–Keilaniemi light-rail line

The OSM route geometry measures 24.24 km, about 3% below the published approximate length of 25 km. The official figure is retained.

Opened25 km
  1. Jun 3, 2019Construction start
  2. Oct 21, 2023Opened
––––

Sources

  1. City of Espoo: Questions and answers about Raide-Jokeriread Oct 13, 2026
  2. City of Espoo: Light-rail services start on 21 October in a carnival atmosphere in Otaniemiread Oct 13, 2026
  3. City of Espoo: Raide-Jokeri came in under budget, final cost will be specified after the warranty periodread Oct 13, 2026
  4. OpenStreetMap: Raide-Jokeri line 15 route relation 13919462read Oct 13, 2026

Figures last checked against their sources in Oct 13, 2026.