Bucharest Metro Line M6 (Gara de Nord – Otopeni Airport)
Metro line under construction between Bucharest's main railway station, Gara de Nord, and Henri Coandă International Airport at Otopeni: about 17.8 km with 16 stations, four of them shared with line M4. Phase II (1 Mai–Tokyo, 6.6 km, 6 stations) started in December 2023 and phase III (Tokyo–Airport, 7.6 km, 6 stations) in March 2025, with completion expected by 2028. The estimated €1.2 billion cost is covered from the national budget, EU funds and a JICA (Japan International Cooperation Agency) loan. It will be the airport's second rail connection, after the Gara de Nord–Otopeni surface link that opened in 2020.
- Total length
- 18 km
- Open today
- 4 km
- Under construction
- 14 km
- Sections
- 3
Includes 4 km whose works another project already measures, either as shared track or as a structure inside one of its sections. Counted in full here, and once in any total that spans projects.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Phase I: Gara de Nord – 1 Mai (shared with M4) Shared track Shared with Bucharest Metro Line M4 (Gara de Nord 2 – Străulești) The four stations between Gara de Nord and 1 Mai were built from 1989 and opened in 2000 as part of line M4; M6 trains will share them | Opened | 4 km |
| – | – | – | – |
| Phase II: 1 Mai – Tokyo Six new stations (Pajura, Expoziției, Piața Montreal, Gara Băneasa, Aeroportul Băneasa and others) on the 6.6 km between 1 Mai and Tokyo; works started December 2023, expected in service 2027. Total M6 cost estimated at €1.2 billion | Under construction | 7 km |
| – |
| – | – |
| Phase III: Tokyo – Henri Coandă Airport Six stations over 7.6 km from Tokyo to the airport terminal; works started March 2025, the whole line expected to be completed by 2028 | Under construction | 8 km |
| – |
| – | – |
This section runs on track another line already owns. It counts in this line's length and is left out of every total that spans projects, so the kilometres are counted once.
Funding
- European Union14 km2 sections
- National budget14 km2 sections
- Loan14 km2 sections
- JICA (Japan International Cooperation Agency) loan
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- RailwaysBucharest Metro Line M1 (Dristor 2 – Pantelimon)Same country and category
- RailwaysBucharest Metro Line M2 (Pipera – Tudor Arghezi)Same country and category
- RailwaysBucharest Metro Line M3 (Preciziei – Anghel Saligny)Same country and category
- RailwaysBucharest Metro Line M4 (Gara de Nord 2 – Străulești)Same country and category
- RailwaysBucharest Metro Line M5 (Drumul Taberei)Same country and category
- RailwaysBrașov – Sighișoara railway rehabilitation (Corridor IV)Same country and category