New Railway across Vestfyn
A new double-track electrified high-speed railway between Odense Vest and Kauslunde, designed for passenger trains up to 250 km/h.
- Total length
- 35 km
- Open today
- 0 km
- Under construction
- 35 km
- Sections
- 1
Category
Railways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Odense Vest–Kauslunde The Transport Ministry reports an approved total expenditure of DKK 6,305.4 million in 2026 prices. Banedanmark says preparatory work began in 2023 and construction began in 2024. The published length is about 35 km. The OSM alignment follows one of the two parallel construction tracks and measures 34.77 km. | Under construction | 35 km |
|
| – | – | – |
Sources
- Banedanmark: New railway across Vestfynread Oct 12, 2026
- Transportministeriet: Anlægsstatus 1, 2026, New Railway across Vestfynread Oct 12, 2026
- OpenStreetMap: New Railway across Vestfyn construction track, way 926175220 and connected waysread Oct 12, 2026
- OpenStreetMap ODbL attribution: construction-track geometry snapshot, 12 October 2026read Oct 12, 2026