Skip to content
InfraWorldWide
← All projects
Bridges

Evripos high bridge, Chalkida

Cable-stayed road bridge, 395 m long with spans of 90 + 215 + 90 m, over the Evripos strait at Chalkida on Euboea. Construction began in May 1985 and it opened on 9 July 1993. It was the first cable-stayed road bridge in Greece.

Total length
0.4 km
Open today
0.4 km
Sections
1
Loading map data…

Sections

Sections of Evripos high bridge, Chalkida: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Evripos high bridge

Length, spans and names from English Wikipedia, which gives S. Schleich as designer and Volos Technical Company SA and Hellenic Technodomiki SA as builders. Greek Wikipedia confirms May 1985 as the start, 9 July 1993 as the inauguration, the same designer and the builders (Τεχνική Εταιρεία Βόλου Α.Ε., Ελληνική Τεχνοδομική Α.Ε.), and gives a total length of 694.5 m including approaches. The recorded 395 m is the cable-stayed structure. Drawn geometry is the OpenStreetMap bridge way (Υψηλή Γέφυρα Ευρίπου) of 0.59 km, which includes approach spans beyond that structure; OpenStreetMap does not tag the main span separately.

Opened0.4 km
  1. May 1985Construction start
  2. Jul 9, 1993Opened
––
  • Volos Technical Company SABuilder
  • Hellenic Technodomiki SABuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. Wikipedia: Euripus Bridgeread Oct 9, 2026
  2. Wikipedia (el): Υψηλή Γέφυρα Ευρίπουread Oct 9, 2026
  3. OpenStreetMap contributors (geometry, ODbL)read Oct 9, 2026

Figures last checked against their sources in Oct 9, 2026.