← All projects
Highways
A8 Wrocław Motorway Bypass
The 22.7 km motorway bypass of Wrocław connects the A4 at Wrocław Południe with the S8 at Wrocław Psie Pole. GDDKiA records construction in 2008–2011. The route includes the Rędziński Bridge and its approach viaducts.
- Total length
- 23 km
- Open today
- 23 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Wrocław Południe (A4) – Wrocław Psie Pole (S8) GDDKiA reports 22.7 km in operation. The project also included connectors and a short S8 section, which are excluded here. The Rędziński Bridge with approach viaducts is 1.742 km long. The drawn line measures 21.56 km; the official length is retained. | Opened | 23 km |
| – | – | – | – |
Related projects
- HighwaysA1 motorway (Rusocin – Toruń – Łódź – Częstochowa – Gliwice – Gorzyczki)Same country and category
- HighwaysA2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki)Same country and category
- HighwaysA4 motorway (Jędrzychowice – Wrocław – Katowice – Kraków – Rzeszów – Korczowa)Same country and category
- HighwaysS1 expressway (Pyrzowice – Dąbrowa Górnicza – Mysłowice – Bielsko-Biała – Żywiec – Zwardoń)Same country and category
- HighwaysS10 expressway (Szczecin – Stargard – Wałcz – Piła – Bydgoszcz – Toruń – Płońsk)Same country and category
- HighwaysS11 expressway, including the Bobolice–Szczecinek sectionSame country and category
Sources
- GDDKiA: Autostrady - stan realizacjiread Oct 12, 2026
- GDDKiA: Autostradowa Obwodnica Wrocławia otwarta do ruchuread Oct 12, 2026
- OpenStreetMap relation 2107913: Autostrada A8read Oct 12, 2026
- OpenStreetMap copyright and licenseread Oct 12, 2026
Figures last checked against their sources in Oct 12, 2026.