Thessaloniki Flyover (Eastern Inner Ring Road upgrade, K5 – K12)

Public-private partnership upgrade of the eastern Inner Ring Road (Periferiaki) of Thessaloniki between junctions K5 and K12: about 13 km of rebuilt and widened road, an elevated expressway, nine grade-separated interchanges and new bridges and tunnels. The contract was signed on 19 December 2022 with a budget of €373.2 million (excluding VAT per later press) and four years of construction. In April 2026 progress was reported above 50%, with delivery targeted for spring 2027.

Total length
13 km
Open today
0 km
Sections
1
Cost on record
€411.312M
1 of 1 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of Thessaloniki Flyover (Eastern Inner Ring Road upgrade, K5 – K12): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Eastern Inner Ring Road: junction K5 – junction K12

Upgrade of the existing Inner Ring Road (A24) between junction K5 (Papageorgiou) and junction K12 (Charilaou–Moudanion). The PPP documents give 13 km; the contractor's presentation, quoted on 22 April 2026, gives 12 km of works, 9 grade-separated interchanges, 7.6 km of elevated avenue including its access ramps, 4 km of rapid-traffic bridge, 9 bridges, 2 covered structures and 1 tunnel. At signing the elevated road was given as 4 km, with 10 new bridges and 3 new tunnels. The construction duration is four years; no construction start date was found. Press reports give May 2027 for completion; the source calls the secure schedule 'spring 2027'. The contractor and concessionaire are not named in the sources found. Geometry follows one carriageway of the existing road from K5 to K12 and measures about 12.8 km; the elevated structures are not drawn separately.

Under construction
46 of 48 contracted months
13 km
  1. Dec 19, 2022Tender awarded
  2. ≈2026Expected openingProjected from contract
  • Estimated €373.2M(2022)Budget of the PPP as stated at signing (ypodomes.com) and described as an estimate in April 2026 (huffingtonpost.gr), excluding VAT (about €462 million with VAT).
  • Public-private partnershipPublic-private partnership: four years of construction, then maintenance under the concession (ypodomes.com, 19 December 2022). An additional €81 million for compensation and supplementary works was reported on 21 April 2026 (huffingtonpost.gr).
–48 mo execution

Funding

  • Public-private partnership13 km
    1 section
    • Public-private partnership: four years of construction, then maintenance under the concession (ypodomes.com, 19 December 2022). An additional €81 million for compensation and supplementary works was reported on 21 April 2026 (huffingtonpost.gr).

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Ypodomes.com: Υπεγράφη η σύμβαση για την κατασκευή του Flyover στη Θεσσαλονίκη (19 December 2022)read Oct 5, 2026
  2. HuffPost Greece: Flyover Θεσσαλονίκης: Πάνω από 50% η πρόοδος, με εντατική δουλειά (22 April 2026)read Oct 5, 2026
  3. OpenStreetMap contributors (geometry, ODbL)read Oct 5, 2026

Figures last checked against their sources in Oct 5, 2026.