S 1 Wiener Außenring Schnellstraße

The S 1 is open south of Vienna between Vösendorf and Schwechat and north of Vienna between Süßenbrunn and Korneuburg. The Schwechat–Süßenbrunn gap is planned in two sections: VA1 from Groß-Enzersdorf to Süßenbrunn and VA2, including the 8.3 km Donau-Lobau tunnel.

Total length
59 km
Open today
40 km
Sections
5
Loading map data…

Sections

Sections of S 1 Wiener Außenring Schnellstraße: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Vösendorf–SchwechatOpened16 km
  1. Apr 28, 2006Opened
––––
Süßenbrunn–Eibesbrunn

The geometry follows the mapped motorway corridor and draws about 7.2 km against the sourced 10 km section length. The sourced figure is retained; the route cut is incomplete at the Süßenbrunn end.

Opened10 km
  1. Oct 31, 2009Opened
––––
Eibesbrunn–KorneuburgOpened14 km
  1. Jan 31, 2010Opened
––––
VA1 Groß-Enzersdorf–Süßenbrunn

ASFINAG reports preliminary site work in 2026 and states that route construction is planned to start in 2027. The project page gives completion in 2032. The stated length and cost cover VA1.

Planned11 km
  1. 2032Expected opening
––––
VA2 Schwechat–Groß-Enzersdorf and Donau-Lobau tunnel

ASFINAG lists VA2 as planned, with construction no earlier than 2030 and an approximately ten-year duration. The project was halted by the transport minister in December 2021; its present planned status follows ASFINAG's current page. The 8.3 km figure is the tunnel length, not the full VA2 route length, so no total route length is recorded.

Planned8 km–––––

Related projects

Sources

  1. ASFINAG: S 1 Wiener Außenring Schnellstraße, Schwechat to Süßenbrunnread Oct 10, 2026
  2. Wikipedia: Wiener Außenring Schnellstraßeread Oct 10, 2026
  3. OpenStreetMap: S 1 open motorway networkread Oct 10, 2026
  4. OpenStreetMap: S 1 Ausbau, proposed alignmentread Oct 10, 2026