S 10 Mühlviertler Schnellstraße
The S 10 runs north from Unterweitersdorf toward the Czech border at Wullowitz. The 22 km section to Freistadt Nord opened in 2015. The Freistadt Nord–Rainbach Nord section is under construction, and the Rainbach Nord–Wullowitz border section is planned.
- Total length
- 38 km
- Open today
- 22 km
- Under construction
- 7 km
- Sections
- 3
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Unterweitersdorf–Freistadt Nord The sourced length is 22 km. The OSM-derived line measures about 19.2 km; the published length is retained because the mapped centerline cut is shorter. | Opened | 22 km |
| – | – | – | – |
| Freistadt Nord–Rainbach Nord The 7.2 km project is built in two construction lots. ASFINAG lists the total project cost as €361.5 million and planned completion in 2027. The mapped construction alignment measures about 7.8 km. | Under construction | 7 km |
| – | – | – | – |
| Rainbach Nord–Wullowitz border ASFINAG submitted the project for environmental assessment on 22 October 2025. The length, cost, 2029 target construction start and 2032 planned completion are ASFINAG estimates. The line follows the mapped proposed OSM alignment. | Planned | 9 km |
| – | – | – | – |
Related projects
Sources
- ASFINAG: S 10 Freistadt Nord–Rainbach Nordread Oct 10, 2026
- ASFINAG: S 10 Rainbach Nord–Staatsgrenze bei Wullowitzread Oct 10, 2026
- BMIMI: S 10 Mühlviertler Schnellstraßeread Oct 13, 2026
- Wikipedia: Mühlviertler Schnellstraßeread Oct 10, 2026
- OpenStreetMap: S 10 route geometry, proposed way 48633414read Oct 10, 2026