A8 Olympia Odos Motorway
Tolled motorway of 277 km from the Elefsina–Thiva interchange west of Athens to Corinth, Patras and Pyrgos, operated by the concessionaire Olympia Odos S.A. under a concession that took effect in 2008 and, after Patras – Pyrgos was added, runs to the end of 2044. The concession runs over four sections: Elefsina – Ancient Corinth (64 km, an existing motorway refurbished), Corinth – Patras (120 km, rebuilt to motorway standard on the old alignment and opened in stages from 2016 to April 2017), the Patras bypass (18 km, opened 2002) and Patras – Pyrgos (75 km, built from March 2022 and opened in 2025). The A8 number covers Elefsina – Rio; the Patras bypass and Patras – Pyrgos carry the A5 number but belong to the same concession. Lengths are the concessionaire's section figures, except where a lot note says otherwise.
- Total length
- 277 km
- Open today
- 277 km
- Sections
- 7
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Elefsina – Ancient Corinth From the Elefsina–Thiva interchange to the Ancient Corinth interchange. National Road 8A, converted to a motorway from the mid-1980s; Greek Wikipedia dates completion to 1995, when only a stretch near Megara (km 44–48) still lacked a central reservation. The Kakia Skala realignment with five tunnels was built from 1999: the carriageway from Athens towards Corinth opened before summer 2004 and the Corinth to Athens carriageway on 30 June 2006. Refurbished by the concessionaire from 2008. | Opened | 64 km |
| – | – | – | – |
| Ancient Corinth – Kiato First completed section of the Corinth – Patras rebuild, with the Zevgolatio and Kiato interchanges. Works on Corinth – Patras began in 2008, stopped in 2010–2011 over financing and restarted in 2013 (Greek Wikipedia). | Opened | 20 km |
| – |
|
| – |
| Kiato – Xylokastro From the Kiato interchange to the Xylokastro interchange, 14 km with one interchange. | Opened | 14 km |
| – |
|
| – |
| Xylokastro – Rio From the Xylokastro interchange to the K1 interchange of the Patras bypass at Rio, where the A8 meets the A5. Length derived: the concessionaire's 120 km for Corinth – Patras less 20 km and 14 km for the two earlier sections; ypodomes.com gave about 90 km in February 2017. Includes the Panagopoula tunnel, 3,179 m towards Patras and 4,033 m towards Athens. | Opened | 86 km |
| – |
|
| – |
| Patras bypass (Rio – Mintilogli) From the first interchange (K1) at Rio to the last (K7) at Mintilogli. Works began in early 1982; a part inaugurated in 1993 had to be rebuilt over defects. Inaugurated by the Prime Minister on 19 December 2002 while link roads were still missing; Greek Wikipedia gives 2003 for completion. Carries the A5 number; refurbished by the Olympia Odos concessionaire from 2008. | Opened | 18 km |
| – | – | – | – |
| Mintilogli – Kaminia From the Mintilogli semi-interchange (km 0+000) at the end of the Patras bypass to Kaminia, about km 10; sources also call it Mintilogli – Alissos (the Alissos semi-interchange is at km 12+725). Built by widening the existing national road under traffic, as part of AVAX's Mintilogli – Karaiika contract. Budget for all of Patras – Pyrgos: 295 million euro, and 385 million euro spent including supplementary works; the concessionaire gives a construction cost of 331 million euro. None is split per lot. | Opened | 10 km |
| – |
|
| – |
| Kaminia – Pyrgos From Kaminia, about km 10, to the Pyrgos interchange (km 73+843), with the Kato Achaia, Varda, Kyllini, Gastouni and Amaliada interchanges. Mostly on a new alignment through the Ilida valley. Inaugurated on 31 July 2025 and open to traffic from noon on 1 August 2025. Works were split AVAX (Mintilogli – Karaiika), Aktor (Karaiika – Gastouni) and TERNA (Gastouni – Pyrgos). Costs are recorded only for Patras – Pyrgos as a whole; see Mintilogli – Kaminia. | Opened | 65 km |
| – |
|
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- Public-private partnership195 km5 sections
- Corinth – Patras as a whole, whose construction cost reached 1,487 million euro, was financed 38% from private funds (29% bank loans, 9% equity), 33% from EU funds, 23% from users' contribution and 6% from the Greek State. No per-lot split published.
- Patras – Pyrgos as a whole: during construction, 35% concessionaire funds (bank loans and equity) and 65% EU and Greek State, per the concessionaire. Co-financed by the NSRF (ESPA) 2014–2020 and 2021–2027 with 143 million euro and by national resources. No per-lot split published.
- European Union195 km5 sections
- National budget195 km5 sections
- Other120 km3 sections
- Users' contribution.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- BridgesRio – Antirrio Bridge (Charilaos Trikoupis Bridge)Same contractor: AVAX, Aktor, VINCI Construction Grands Projets
- HighwaysA1 Motorway Athens – Thessaloniki – Evzonoi (PATHE)Same contractor: Aktor, TERNA
- HighwaysA5 Ionia Odos (Antirrio – Ioannina)Same contractor: AVAX, TERNA
- HighwaysBOAK Northern Crete Motorway (Kissamos – Agios Nikolaos)Same contractor: Aktor, TERNA
- HighwaysA3 Struma MotorwaySame contractor: Aktor
- HighwaysA7 Moreas Motorway (Corinth – Tripoli – Kalamata) and A71 Lefktro – SpartiSame contractor: TERNA
Sources
- Wikipedia: A8 motorway (Greece)read Sep 28, 2026
- Wikipedia: Olympia Odosread Sep 28, 2026
- Greek Wikipedia: Ολυμπία Οδός (Αυτοκινητόδρομος 8)read Sep 28, 2026
- Greek Wikipedia: Αυτοκινητόδρομος Πάτρα - Πύργος - Τσακώναread Sep 28, 2026
- Greek Wikipedia: Περιμετρική Οδός Πατρώνread Sep 28, 2026
- Olympia Odos S.A.: About us (concessionaire, shareholders, Apion Kleos Construction JV)read Sep 28, 2026
- Olympia Odos S.A.: Design & Construction (sections, lengths, Patras – Pyrgos chainages)read Sep 28, 2026
- Olympia Odos S.A.: Financingread Sep 28, 2026
- ypodomes.com: Ολυμπία Οδός: Παραδίδεται το τμήμα μέχρι Ξυλόκαστρο και οι Σήραγγες Παναγοπούλας (20 February 2017)read Sep 28, 2026
- ypodomes.com: Ολυμπία Οδός: Οι κυκλοφοριακές ρυθμίσεις για το τριήμερο της Καθαράς Δευτέρας (24 February 2017)read Sep 28, 2026
- ypodomes.com: Σε λειτουργία η Ολυμπία Οδός, αυτοκινητόδρομος πλέον από Ελευσίνα μέχρι Πάτρα (11 April 2017)read Sep 28, 2026
- Ta Nea: Έτοιμη η περιμετρική Πάτρας μετά είκοσι χρόνια! (1 November 2002)read Sep 28, 2026
- Rizospastis: Φιέστα εγκαινίων της μισοτελειωμένης Περιμετρικής (19 December 2002)read Sep 28, 2026
- ypodomes.com: Ολυμπία Οδός: Σε λειτουργία από 1/8 τα 65 χλμ. από Καμίνια – Πύργο (30 July 2025)read Sep 28, 2026
- ypodomes.com: Ιστορική ημέρα για την Ηλεία: Παραδίδονται σήμερα 65 χιλιόμετρα του νέου αυτοκινητόδρομου Πάτρα – Πύργος (31 July 2025)read Sep 28, 2026
- ypodomes.com: Ολυμπία Οδός: παραδόθηκαν σήμερα από την AVAX τα τελευταία 10 χιλιόμετρα του άξονα Πάτρα – Πύργος (4 December 2025)read Sep 28, 2026
- ypodomes.com: ΕΡΓΟ ΤΗΣ ΧΡΟΝΙΑΣ 2025 ο αυτοκινητόδρομος Πάτρα – Πύργος (7 January 2026)read Sep 28, 2026
- OpenStreetMap contributors: route geometry (ODbL)read Sep 28, 2026
Figures last checked against their sources in Sep 28, 2026.