R3 expressway (Orava and Turiec sections)
Expressway planned from the Polish border at Trstená through Dolný Kubín to the D1 and, in two further parts, from Martin to Ráztočno and from Budča to the Hungarian border near Šahy. sk.wikipedia counts 24.2 km in operation, all of it one carriageway: the Trstená bypass (2010), Tvrdošín – Nižná (2025), Oravský Podzámok – Horná Lehota (2007) and the detached Horná Štubňa bypass (2010). Nižná – Dlhá nad Oravou and Dlhá nad Oravou – Sedliacka Dubová are at building-permit documentation stage (NDS); other sections are at EIA or earlier stages. Only these four built sections are recorded as lots.
- Total length
- 22 km
- Open today
- 22 km
- Sections
- 4
- Cost on record
- €74.063M
- 1 of 4 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Trstená bypass First section of the R3, from the temporary connection to the I/59 north of Trstená past the Trstená exit to the Tvrdošín exit. One carriageway only. historiadialnic.sk gives 6.716 km (right carriageway) and a start on 31 March 2008; sk.wikipedia gives 7.2 km and says construction started in April 2008 and ran for 30 months. 14 bridges. The drawn line is 6.45 km, cut at the north end of the trunk ways with ref R3 and at the Tvrdošín junction node. | Opened | 7 km |
| – |
|
| – |
| Tvrdošín – Nižná Bypass of Tvrdošín from the Tvrdošín exit on the Trstená bypass to the Nižná junction, on the left bank of the Orava. Built as one carriageway (category R 24.5/100), with 260 m in full profile from km 3.900 to km 4.160. NDS counts 5.6 km including 480 m of junction ramps and a 697 m feeder; the 4.4 km is the R3 route itself. Tender launched on 24 July 2017 at an expected EUR 74.98 million excluding VAT. A first evaluation on 2 December 2019 named a Todini-led consortium at EUR 59.40 million excluding VAT, after objections; the contract was signed with Hochtief SK, Porr and Hydroekol Dolný Kubín on 25 February 2021 (the 20 November 2020 release named Alpine Slovakia instead of Porr). Contract duration converted from days: 822 days. NDS first expected opening in 2023; on 23 March 2023 it said harder rock, a pyrotechnic survey and gas pipeline relocations would move completion and the final price. The drawn line runs 4.47 km to the end of the ways with ref R3 before the proposed continuation. | Opened | 4 km |
|
|
|
| 27 mo execution · Contract value €62M |
| Oravský Podzámok – Horná Lehota Bypass between two temporary connections to the I/59, west and east. One carriageway, category R 11.5/100, speed limit 100 km/h, signed as I/59A until it becomes part of the R3. 9 bridges, the main one 750 m long over the Orava and the railway. historiadialnic.sk gives 6.442 km (right carriageway), a start in November 2004 and opening on 26 November 2007. The drawn line is 5.61 km, from the first to the last way with ref R3 as trunk road, and omits the connection roads at both ends. | Opened | 6 km |
| – |
|
| – |
| Horná Štubňa bypass Bypass of Horná Štubňa on the I/65 between the Kremnické Bane and Šturec passes, with a temporary connection to the I/65 at each end. One carriageway only, a detached part of the R3 with no link to the other sections. 6 bridges. historiadialnic.sk gives 4.321 km (left carriageway), a start on 17 December 2008 and opening on 23 November 2010; the sk.wikipedia section table gives 4.7 km. The drawn line is 3.99 km, from the first to the last way with ref R3 as trunk road, and omits the connection roads at both ends. | Opened | 4 km |
| – |
|
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- National budget17 km3 sections
- State budget (sk.wikipedia).
- European Union4 km1 section
- Operational Programme Integrated Infrastructure and Program Slovensko (NDS, July 2025). The 2021 signing release gave the state budget.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysD0 Prague Ring Road (Pražský okruh)Same contractor: Hochtief, Max Bögl, Porr, Skanska, Strabag
- HighwaysD3 motorway (Hričovské Podhradie – Žilina – Čadca – Polish border)Same contractor: Hochtief, Porr, Skanska, Strabag, Váhostav
- HighwaysR2 expressway (Trenčín – Prievidza – Zvolen – Lučenec – Rimavská Sobota – Rožňava – Košice)Same contractor: Hochtief, Inžinierske stavby, Strabag, Váhostav
- HighwaysR4 expressway (Košice – Prešov – Svidník – Polish border)Same contractor: Inžinierske stavby, Skanska, Strabag, Váhostav
- HighwaysD1 motorway (Praha – Brno – Ostrava – Polish border)Same contractor: Inžinierske stavby, Skanska, Strabag
- HighwaysS3 expressway (Świnoujście – Szczecin – Zielona Góra – Legnica – Lubawka)Same contractor: Max Bögl, Porr, Strabag
Sources
- Wikipedia (sk): Rýchlostná cesta R3 (Slovensko), section table and 'Úseky' proseread Oct 10, 2026
- História diaľnic: História 2004 (R3 Horná Lehota – Oravský Podzámok, right carriageway 6.442 km, start November 2004)read Oct 10, 2026
- História diaľnic: História 2007 (R3 Horná Lehota – Oravský Podzámok opened 26 November 2007)read Oct 10, 2026
- História diaľnic: História 2008 (starts of R3 Trstená bypass 31 March 2008 and Horná Štubňa bypass 17 December 2008)read Oct 10, 2026
- História diaľnic: História 2010 (openings of R3 Trstená bypass 29 October 2010 and Horná Štubňa bypass 23 November 2010)read Oct 10, 2026
- NDS: Vypísali sme súťaž na úsek R3 Tvrdošín – Nižná (24 July 2017)read Oct 10, 2026
- NDS: NDS vyhodnotila ponuky na úsek R3 Tvrdošín – Nižná (2 December 2019)read Oct 10, 2026
- NDS: R3 na Orave: Zakrátko podpíšeme zmluvu na jej výstavbu (20 November 2020)read Oct 10, 2026
- NDS: Štartuje výstavba R3 na Orave (25 February 2021)read Oct 10, 2026
- NDS: Stavba R3 Tvrdošín – Nižná si vyžiada úpravu technológie (23 March 2023)read Oct 10, 2026
- NDS: Tvrdošín získal rýchlostný obchvat (21 July 2025)read Oct 10, 2026
- OpenStreetMap contributors (ODbL): ways with ref R3, via Overpass APIread Oct 10, 2026