Skip to content
InfraWorldWide
← All projects
Highways

Blankenburg Connection (A24)

A new tolled motorway link between the A20 west of Vlaardingen and the A15 near Rozenburg.

Total length
4 km
Open today
4 km
Sections
1
Loading map data…

Sections

Sections of Blankenburg Connection (A24): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
A20 Vlaardingen–A15 Rozenburg

Rijkswaterstaat reports a 4.2 km route length. The OSM line follows one carriageway of route relation 14655709 and measures 4.15 km. The connection also includes the Hollandtunnel and Maasdeltatunnel.

Opened4 km
  1. 2017Tender awarded
  2. 2018Construction start
  3. Dec 7, 2024Opened
  • Estimated €2.1BestimatedThe government states a project budget of EUR 2,138 million at 2025 prices. The DBFM project budget includes the integrated contract, financing, maintenance and operation through 2043, so it is not a construction outturn.
–
  • BAAKBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. Rijkswaterstaat: A24 (Blankenburgverbinding) opened to trafficread Oct 11, 2026
  2. Rijkswaterstaat: A24 motorway factsread Oct 11, 2026
  3. Rijkswaterstaat: Blankenburg Connection (A24) opens on 7 December 2024read Oct 11, 2026
  4. Dutch Ministry of Infrastructure and Water Management: 2026 Mobility Fund budgetread Oct 12, 2026
  5. OpenStreetMap: A24 route relation 14655709read Oct 11, 2026
  6. Ministry of Infrastructure and Water Management: MIRT Overview 2019, A24 Blankenburg Connectionread Oct 12, 2026