Salaca bridge reconstruction
Replacement of the A1 bridge over the Salaca in Salacgrīva for civilian and military use.
- Total length
- 0.2 km
- Open today
- 0.2 km
- Sections
- 1
Category
Bridges
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| A1 Salaca bridge LVC reports that the new bridge opened to traffic in both directions on 12 November 2025. The wider project period runs through 30 April 2026, and completion of all work was planned for December 2025. The mapped OpenStreetMap bridge way measures 0.198 km; LVC identifies the site as A1 km 91.10. No as-built bridge length is reported. | Opened | 0.2 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Sources
- Reconstruction of the bridge over Salaca for enhanced dual useread Oct 13, 2026
- Construction of the temporary bridge over the Salaca in Salacgrīvaread Oct 13, 2026
- OpenStreetMap: A1 bridge over the Salacaread Oct 13, 2026