Salaca bridge reconstruction

Replacement of the A1 bridge over the Salaca in Salacgrīva for civilian and military use.

Total length
0.2 km
Open today
0.2 km
Sections
1
Loading map data…

Sections

Sections of Salaca bridge reconstruction: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
A1 Salaca bridge

LVC reports that the new bridge opened to traffic in both directions on 12 November 2025. The wider project period runs through 30 April 2026, and completion of all work was planned for December 2025. The mapped OpenStreetMap bridge way measures 0.198 km; LVC identifies the site as A1 km 91.10. No as-built bridge length is reported.

Opened0.2 km
  1. Jun 10, 2024Construction start
  2. Nov 12, 2025Opened
––
  • PS NB & TILTSBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Sources

  1. Reconstruction of the bridge over Salaca for enhanced dual useread Oct 13, 2026
  2. Construction of the temporary bridge over the Salaca in Salacgrīvaread Oct 13, 2026
  3. OpenStreetMap: A1 bridge over the Salacaread Oct 13, 2026