Divača–Koper second railway track
2TDK is building a new 27.1 km single-track railway between Divača and Koper, beside the existing line. Construction includes eight tunnels, two viaducts and two other major structures. Rail vehicles traversed the new track in March 2026 and testing began.
- Total length
- 27 km
- Open today
- 0 km
- Under construction
- 27 km
- Sections
- 1
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Divača–Koper second track 2TDK signed separate main civil works contracts: Divača–Črni Kal on 5 May 2021 and Črni Kal–Koper on 31 March 2021, both with the Kolektor CPG, Yapı Merkezi and Özaltın consortium. GZS reports EUR 403,613,361.12 excluding VAT for the Divača–Črni Kal contract. For Črni Kal–Koper, eTransport reported EUR 224.749 million excluding VAT in 2021. In February 2025, 2TDK reported a revised value of EUR 250,970,313.16 excluding VAT and an increase of EUR 23,293,438.75 from the preceding value. The 2025 page does not reconcile the earlier report's different figure. These are civil works contract values, not the total project cost, and are not placed in the whole-route cost field. The 27.1 km length is the official route length; the OSM line is about 24.6 km and stops short of the complete official alignment. RTV Slovenija reported on 17 September 2026 that main works were expected to finish by year-end, followed by testing and permits; the line was not yet open. | Under construction | 27 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Related projects
- HighwaysA7 Motorway (Rupa – Rijeka – Žuta Lokva)Same contractor: Kolektor CPG
- HighwaysA3 Transylvania Motorway (Brașov–Cluj–Borș)Same contractor: Özaltın
- HighwaysA8 Târgu Mureș–Iași–Ungheni Motorway (Unirii)Same contractor: Özaltın
- HighwaysCraiova–Pitești Expressway (DEx12)Same contractor: Özaltın
- TunnelsRomanian road tunnelsSame contractor: Özaltın
- RailwaysMaribor – Šentilj railway upgradeSame country and category
Sources
- GOV.SI: Construction of the second track between Divača and Koperread Oct 13, 2026
- GOV.SI: Minister Vrtovec on the second track contract for Črni Kal–Koper (31 March 2021)read Oct 13, 2026
- GOV.SI: Symbolic start of main construction works for Divača–Črni Kal (5 May 2021)read Oct 13, 2026
- GZS ZGIGM: Contract for Divača–Črni Kal and start of the second trackread Oct 13, 2026
- eTransport: Start of construction of the Divača–Koper second track (June 2021)read Oct 13, 2026
- 2TDK: The Second Track project remains within the investment values defined in NIP2 (7 February 2025)read Oct 13, 2026
- GOV.SI: Government report 2022–2026, rail vehicle pass and testing on the second trackread Oct 13, 2026
- OpenStreetMap contributors: Divača–Koper second track geometry (ODbL)read Oct 13, 2026
- RTV Slovenija: Second track stays within budget, works and tests timeline (17 September 2026)read Oct 13, 2026