A2 pavement reconstructions, 2015–2023
Pavement-strengthening works on three sections of the A2 between Riga and Sigulda.
- Total length
- 31 km
- Open today
- 31 km
- Sections
- 3
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| A2, km 15.40–25.50 LVC reports 20.20 km of carriageway rebuilt over this 10.10 km chainage interval. The mapped line follows one carriageway. LVC records commissioning on 28 January 2016; the opening date here follows the reported works completion date. The published EUR 16.44 million is total eligible project cost, not a construction outturn, and is omitted. | Opened | 10 km |
| – | – | – | – |
| A2, km 25.50–39.40 LVC groups this section with A3 km 0.00–1.65 and reports a combined 34.95 km of carriageway, including both A2 carriageways and project access roads. This lot follows the A2 chainage interval and maps one carriageway. LVC records commissioning on 20 November 2020; the opening date here follows the reported works completion date. The published EUR 43.96 million is the eligible cost for the combined A2 and A3 project, not a construction outturn, and is omitted. | Opened | 14 km |
| – | – | – | – |
| A2, km 39.44–46.30 LVC reports 13.72 km of carriageway rebuilt over this 6.86 km chainage interval. The mapped line follows one carriageway. LVC records commissioning on 22 December 2023; the opening date here follows the reported works completion date. The published EUR 13.87 million is total eligible project cost, not a construction outturn, and is omitted. | Opened | 7 km |
| – | – | – | – |