Highways

Ķekava bypass (A7)

A new section of the A7 and E67 south of Riga, built as a public-private partnership.

Total length
14 km
Open today
14 km
Sections
1
Loading map data…

Sections

Sections of Ķekava bypass (A7): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
A7, km 7.9–25.0

Length measured from OpenStreetMap geometry (13.64 km). The OSM line uses one carriageway from the A7 route relation. LVC gives a project breakdown of 12.22 km of four-lane road, 5.36 km of two-lane road and 20.7 km of parallel roads and overpasses; the published figures cover more than the mapped line. The project also includes two tunnels and six bridges and overpasses.

Opened14 km
  1. Aug 13, 2020Tender awarded
  2. Dec 2021Construction start
  3. Oct 13, 2023Opened
––
  • PA Kekava ABTConcessionaire
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. Latvijas Valsts ceļi: Ķekava bypass PPP projectread Oct 11, 2026
  2. OpenStreetMap: A7 road route relation 164956read Oct 11, 2026
  3. Latvijas Valsts ceļi: Construction begins on the Ķekava bypassread Oct 12, 2026