Kuzmin – Sremska Rača motorway with Sava bridge (towards Bijeljina)

Motorway of about 18 km from the A3 near Kuzmin to the Sava and a new bridge to the border with Bosnia and Herzegovina, the first section of the route towards Bijeljina. The bridge carries an integrated border crossing. Taşyapı is named as contractor in press reports. In August 2026 the motorway was about 89% and the bridge 99.5% complete.

Total length
18 km
Open today
0 km
Under construction
18 km
Sections
2
Loading map data…

Sections

Sections of Kuzmin – Sremska Rača motorway with Sava bridge (towards Bijeljina): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Kuzmin – Sava north abutment

Press gives about 18 km for the whole section including the Sava bridge, with no figure for the motorway alone; the length here is measured from OpenStreetMap geometry, from the A7 start near Kuzmin to the north abutment of the Sava bridge. The A7 start lies about 0.4 km short of the A3 Kuzmin junction, where the link ramps are still mapped separately as under construction. Reported progress on 21 August 2026: about 89% physically complete. The works value of about EUR 225 million is a press estimate and covers the section with the bridge, so it is not recorded as a cost. Works began in March 2022 per press; the first completion deadline, 2023, was moved. OpenStreetMap already maps most of this carriageway as motorway (ref A7, access=no), which is not evidence of opening.

Under construction17 km
  1. Mar 2022Construction start
––
  • TaşyapıBuilder
–
Sava bridge and border crossing

Bridge of about 1.3 km over the Sava to the Bosnia and Herzegovina border, with an integrated border crossing. Press: bridge construction began in October 2019. Reported progress on 21 August 2026: 99.5% complete. The OpenStreetMap carriageway drawn here is 1.14 km, against the sourced figure of about 1.3 km, which is kept. The motorway lot ends at the north abutment.

Under construction1 km
  1. Oct 2019Construction start
––
  • TaşyapıBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. Biznis.rs: Raspisan javni poziv za tehnički pregled izvedenih radova na deonici Sremska Rača–Kuzmin (11 July 2025)read Oct 9, 2026
  2. NSreporter: Auto-put Kuzmin – Sremska Rača pred završetkom (21 August 2026)read Oct 9, 2026
  3. OpenStreetMap contributors: A7 Ауто-пут Кузмин - Бијељина ways (ODbL)read Oct 9, 2026