Chalkida bypass and Psachna bypass (North–South Evia artery)

Design and construction of the Chalkida bypass and the Psachna bypass with the connecting North–South Evia artery, about 27 km in total, on the island of Euboea. Contractor METKA under a design-build contract; co-financed from the ESPA 2021–2027 programme and the Cohesion Fund. In July 2026 works were earthworks, structures and excavation of the Vathrovouni tunnel.

Total length
27 km
Open today
0 km
Sections
1
Loading map data…

Sections

Sections of Chalkida bypass and Psachna bypass (North–South Evia artery): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Chalkida bypass, Psachna bypass and North–South Evia artery

The total is about 27 km (ypodomes.com, 15 July 2026). Newmoney.gr (25 November 2024) gives two sections of the main project: Nea Lampsakos to the Vathrovouni tunnel, 2 km, and Vathrovouni tunnel to Psachna, 14.7 km, with the Psachna bypass and a North–South Evia connector as optional sections. No extents are given for those, so the works are kept as one lot. The date of 2 August 2028 follows an 18-month extension granted by the Ministry of Infrastructure and Transport, as reported by newmoney.gr; it is a press report, not the contract, and is recorded as the expected opening. METKA cited delayed property acquisition, transfer of state forest land, design changes at the Nea Lampsakos junction and at the Lake Dokos anti-flooding works, and unfinished studies. The cross-section is not stated. Drawn geometry is the OpenStreetMap highway=construction (construction=trunk) way from the Vathrovouni tunnel northwards, about 15.2 km: it covers only part of the 27 km, and the Nea Lampsakos approach and the Psachna bypass are not drawn. The existing Schimatari – Chalkida A11 branch is a separate road.

Under construction27 km
  1. Aug 2, 2028Expected opening
  • Estimated €169.35Mwhole programmeBudget excluding VAT, as reported by newmoney.gr on 25 November 2024 (EUR 210 million including VAT). Covers the main project (EUR 125 million including VAT) plus optional sections (EUR 85 million including VAT).
  • European UnionCo-financed under the ESPA 2021–2027 programming period, with the participation of the Cohesion Fund (ypodomes.com, 15 July 2026).
  • METKABuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • European Union27 km
    1 section
    • Co-financed under the ESPA 2021–2027 programming period, with the participation of the Cohesion Fund (ypodomes.com, 15 July 2026).

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Ypodomes.com: Με την παράκαμψη Χαλκίδας θα δημιουργηθεί ένας ενιαίος και ασφαλής οδικός άξονας προς τη Βόρεια Εύβοια (15 July 2026)read Oct 9, 2026
  2. Newmoney.gr: Εύβοια, πότε ολοκληρώνεται το έργο για την παράκαμψη της Χαλκίδας (25 November 2024)read Oct 9, 2026
  3. OpenStreetMap contributors (geometry, ODbL)read Oct 9, 2026

Figures last checked against their sources in Oct 9, 2026.