← All projects
Bridges
A 13 Luegbrücke replacement
ASFINAG is replacing the Luegbrücke on the Brenner motorway with two new bridge structures. Construction began in March 2025 and overall completion is planned for the end of 2030.
- Total length
- 2 km
- Open today
- 0 km
- Under construction
- 2 km
- Sections
- 1
Category
Bridges
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Luegbrücke replacement ASFINAG's project page gives an approximate total cost of EUR 380 million, while its November 2025 building programme lists EUR 346 million in total project costs. Both sources give a total length of 1,800 m and describe two new bridge structures. The OSM line follows one mapped carriageway of the existing crossing as the location reference; it measures about 1.8 km. The sources do not state a price year or VAT basis. | Under construction | 2 km |
|
| – | – | – |
Sources
- ASFINAG: A 13 Brenner Autobahn, Luegbrücke replacementread Oct 10, 2026
- OpenStreetMap: A 13 bridge at Lueg, way 44572234read Oct 10, 2026
- ASFINAG: Bauprogramm 2026–2031, Stand November 2025read Oct 13, 2026