A4 Maritsa Motorway
A 117 km motorway in southern Bulgaria linking the Trakia motorway (A1) at Orizovo to the Turkish border at Kapitan Andreevo, on Pan-European Corridor IV and European route E80. It opened in phases between October 2010 and October 2015. A 16.66 km Harmanli – Lyubimets section had first opened on 16 May 2007, then closed for repair and reopened with Lyubimets – Svilengrad on 2 October 2010. The last 5 km before the border opened on 14 August 2014. The western sections, Orizovo – Dimitrovgrad and Dimitrovgrad – Harmanli, were co-funded by the EU; the eastern sections were financed nationally, except the border approach (km 114–117), a Ministry of Finance project financed by the World Bank.
- Total length
- 101 km
- Open today
- 101 km
- Sections
- 4
- Cost on record
- €186.099M
- 2 of 4 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Orizovo – Dimitrovgrad Dates, cost and contractor are for API Lot 1 Orizovo – Dimitrovgrad (km 5+000 – 36+400), built 2011–2015. Length corrected from 43 km to 31.4 km, the figure the API Lot 1 page states for km 5+000 – 36+400. The route starts at the road II-66 Chirpan – Popovitsa crossing (km 5+000); the drawn line starts at the Orizovo junction, about 2 km further west, on a stretch built earlier. Contract duration stated as 31 months and 29 calendar days. Пътища Пловдив АД built only the additional slope-stabilisation and drainage works on Lot 1, under a separate contract. | Opened | 31 km |
| – |
|
| 32 mo total · Contract value лв133.13M |
| Dimitrovgrad – Harmanli API Lot 2 Dimitrovgrad – Harmanli, km 36+400 – 70+620. The API Lot 2 page states 34.22 km. | Opened | 34 km |
| – |
|
| 46 mo execution · 46 mo total · Contract value лв122.137M |
| Harmanli – Svilengrad Contractors are the builders of the Harmanli – Lyubimets section (km 71+011 – 89+100), opened on 16 May 2007, with supervision by Pătinvestinzhenering AD. The builder of the 2010 repair and of Lyubimets – Svilengrad is not named in the sources found. The drawn line runs from km 70+620 to the Generalovo junction, so it also covers km 108+260 – 112, for which no opening date was found. | Opened | 31 km |
|
|
|
| – |
| Km 112 – Kapitan Andreevo border crossing Opened on 14 August 2014 with a temporary traffic layout; 5.02 km per the API. The drawn line starts at the Generalovo junction, the nearest named junction to km 112, and runs to the border. | Opened | 5 km |
| – |
| – | – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- National budget101 km4 sections
- National co-financing.
- State budget, through the Road Infrastructure Agency, for the works opened in October 2010.
- Km 112–114, built by the Road Infrastructure Agency from the state budget.
- European Union65 km2 sections
- Cohesion Fund via OP Transport 2007–2013. The grant for Lots 1 and 2 together is 251.04 million leva, 80% of the project.
- Cohesion Fund via OP Transport 2007–2013. The grant agreement for Lots 1 and 2 together is 313.80 million leva including VAT: 251.04 million from the Cohesion Fund, 62.76 million national co-financing.
- Loan5 km1 section
- Km 114–117, next to the border crossing: a Ministry of Finance project financed by the World Bank.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA1 Trakia MotorwaySame contractor: Moststroy
- HighwaysA2 Hemus MotorwaySame contractor: Moststroy
- HighwaysA3 Struma MotorwaySame contractor: Patishta Plovdiv
- RailwaysSofia – Plovdiv railway modernisationSame contractor: Porr
- HighwaysD0 Prague Ring Road (Pražský okruh)Same contractor: Porr
- HighwaysD11 motorway (Praha – Hradec Králové – Jaroměř – Trutnov – Polish border)Same contractor: Porr
Corridors
The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.
- Pan-European Corridor IVPan-European
Sources
- Wikipedia: Maritsa motorway
- Road Infrastructure Agency: AM Maritsa Lot 2 (archived 2014)read Sep 25, 2026
- Road Infrastructure Agency: AM Maritsa, OP Transport project page (archived 2016)read Sep 25, 2026
- Darik News: Premier Boyko Borisov opens a section of the Maritsa motorway (2 October 2010)read Sep 25, 2026
- Vestnik Stroitel: Lot 2 of AM Maritsa, another successful OP Transport project (11 June 2015)read Sep 25, 2026
- Road Infrastructure Agency: AM Maritsa Lot 1 (archived 2014)read Sep 28, 2026
- Уикипедия: Марица (магистрала)read Sep 28, 2026
- Агенция „Пътна инфраструктура“: Позиция относно публикации в медиите за АМ „Марица“, лот 1 (27 April 2017, archived)read Oct 1, 2026
- Агенция „Пътна инфраструктура“: Отворени ценови оферти за допълнителни строителни работи на лот 1 на АМ „Марица“ (25 May 2015, archived)read Oct 1, 2026
- Агенция „Пътна инфраструктура“: АМ „Марица“ лот 1 (archived 2022)read Oct 1, 2026
- Агенция „Пътна инфраструктура“: Пуснато е движението по участъка от АМ „Марица“ от км 112 до км 117 (14 August 2014, archived)read Oct 2, 2026
- OpenStreetMap contributors (geometry, ODbL)read Oct 2, 2026