Highways

A4 Maritsa Motorway

A 117 km motorway in southern Bulgaria linking the Trakia motorway (A1) at Orizovo to the Turkish border at Kapitan Andreevo, on Pan-European Corridor IV and European route E80. It opened in phases between October 2010 and October 2015. A 16.66 km Harmanli – Lyubimets section had first opened on 16 May 2007, then closed for repair and reopened with Lyubimets – Svilengrad on 2 October 2010. The last 5 km before the border opened on 14 August 2014. The western sections, Orizovo – Dimitrovgrad and Dimitrovgrad – Harmanli, were co-funded by the EU; the eastern sections were financed nationally, except the border approach (km 114–117), a Ministry of Finance project financed by the World Bank.

Total length
101 km
Open today
101 km
Sections
4
Cost on record
€186.099M
2 of 4 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of A4 Maritsa Motorway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Orizovo – Dimitrovgrad

Dates, cost and contractor are for API Lot 1 Orizovo – Dimitrovgrad (km 5+000 – 36+400), built 2011–2015. Length corrected from 43 km to 31.4 km, the figure the API Lot 1 page states for km 5+000 – 36+400. The route starts at the road II-66 Chirpan – Popovitsa crossing (km 5+000); the drawn line starts at the Orizovo junction, about 2 km further west, on a stretch built earlier. Contract duration stated as 31 months and 29 calendar days. Пътища Пловдив АД built only the additional slope-stabilisation and drainage works on Lot 1, under a separate contract.

Opened31 km
  1. Aug 1, 2011Tender awarded
  2. Oct 20, 2011Construction start
  3. Oct 29, 2015Opened
–
  • European UnionCohesion Fund via OP Transport 2007–2013. The grant for Lots 1 and 2 together is 251.04 million leva, 80% of the project.
  • National budgetNational co-financing.
  • Кооперативно дружество „Кооператива Муратори & Чементисти – Чи. Ем. Чи. Ди. Равенна“Builder
  • Пътища Пловдив АДBuilder
32 mo total · Contract value лв133.13M
Dimitrovgrad – Harmanli

API Lot 2 Dimitrovgrad – Harmanli, km 36+400 – 70+620. The API Lot 2 page states 34.22 km.

Opened34 km
  1. Jul 25, 2011Tender awarded
  2. Jul 26, 2011Construction start
  3. May 28, 2015Opened
–
  • European UnionCohesion Fund via OP Transport 2007–2013. The grant agreement for Lots 1 and 2 together is 313.80 million leva including VAT: 251.04 million from the Cohesion Fund, 62.76 million national co-financing.
  • National budgetNational co-financing.
  • Сдружение “Марица Хайуей” (ПСТ Холд АД – ПООР БАУ ГМБХ)Builder
46 mo execution · 46 mo total · Contract value лв122.137M
Harmanli – Svilengrad

Contractors are the builders of the Harmanli – Lyubimets section (km 71+011 – 89+100), opened on 16 May 2007, with supervision by Pătinvestinzhenering AD. The builder of the 2010 repair and of Lyubimets – Svilengrad is not named in the sources found. The drawn line runs from km 70+620 to the Generalovo junction, so it also covers km 108+260 – 112, for which no opening date was found.

Opened31 km
  1. Oct 2, 2010Opened
  • Actual лв36Mworks onlyWorks on the 31 km opened on 2 October 2010 (Harmanli – Lyubimets rehabilitation and new Lyubimets – Svilengrad). Excludes the earlier Harmanli – Lyubimets build, opened in May 2007 for about 65 million leva. VAT not stated.
  • National budgetState budget, through the Road Infrastructure Agency, for the works opened in October 2010.
  • Пътни строежи АД (Пловдив)Builder
  • Мостстрой АДBuilder
–
Km 112 – Kapitan Andreevo border crossing

Opened on 14 August 2014 with a temporary traffic layout; 5.02 km per the API. The drawn line starts at the Generalovo junction, the nearest named junction to km 112, and runs to the border.

Opened5 km
  1. Aug 14, 2014Opened
–
  • National budgetKm 112–114, built by the Road Infrastructure Agency from the state budget.
  • LoanKm 114–117, next to the border crossing: a Ministry of Finance project financed by the World Bank.
––

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • National budget101 km
    4 sections
    • National co-financing.
    • State budget, through the Road Infrastructure Agency, for the works opened in October 2010.
    • Km 112–114, built by the Road Infrastructure Agency from the state budget.
  • European Union65 km
    2 sections
    • Cohesion Fund via OP Transport 2007–2013. The grant for Lots 1 and 2 together is 251.04 million leva, 80% of the project.
    • Cohesion Fund via OP Transport 2007–2013. The grant agreement for Lots 1 and 2 together is 313.80 million leva including VAT: 251.04 million from the Cohesion Fund, 62.76 million national co-financing.
  • Loan5 km
    1 section
    • Km 114–117, next to the border crossing: a Ministry of Finance project financed by the World Bank.

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Corridors

The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.

  • Pan-European Corridor IVPan-European

Sources

  1. Wikipedia: Maritsa motorway
  2. Road Infrastructure Agency: AM Maritsa Lot 2 (archived 2014)read Sep 25, 2026
  3. Road Infrastructure Agency: AM Maritsa, OP Transport project page (archived 2016)read Sep 25, 2026
  4. Darik News: Premier Boyko Borisov opens a section of the Maritsa motorway (2 October 2010)read Sep 25, 2026
  5. Vestnik Stroitel: Lot 2 of AM Maritsa, another successful OP Transport project (11 June 2015)read Sep 25, 2026
  6. Road Infrastructure Agency: AM Maritsa Lot 1 (archived 2014)read Sep 28, 2026
  7. Уикипедия: Марица (магистрала)read Sep 28, 2026
  8. Агенция „Пътна инфраструктура“: Позиция относно публикации в медиите за АМ „Марица“, лот 1 (27 April 2017, archived)read Oct 1, 2026
  9. Агенция „Пътна инфраструктура“: Отворени ценови оферти за допълнителни строителни работи на лот 1 на АМ „Марица“ (25 May 2015, archived)read Oct 1, 2026
  10. Агенция „Пътна инфраструктура“: АМ „Марица“ лот 1 (archived 2022)read Oct 1, 2026
  11. Агенция „Пътна инфраструктура“: Пуснато е движението по участъка от АМ „Марица“ от км 112 до км 117 (14 August 2014, archived)read Oct 2, 2026
  12. OpenStreetMap contributors (geometry, ODbL)read Oct 2, 2026