Athens Metro Line 4, Section A (Alsos Veikou – Goudi)
First section of Athens Metro Line 4, a driverless line under construction from Alsos Veikou in Galatsi through Kypseli, Exarcheia and Kolonaki to Goudi in Zografou: 12.8 km with 15 underground stations, with interchanges to Line 2 at Akadimia and to Line 3 at Evangelismos. Attiko Metro (now Elliniko Metro) signed the design-and-build contract with AVAX, Ghella and Alstom on 22 June 2021 for €1,158 million excluding VAT, including 20 automated trains. The original deadline of 20 June 2029 was extended in February 2026 to 3 September 2032, a date the contractor disputes. It is the first of five planned sections of a 38.2 km, 35-station U-shaped line.
- Total length
- 13 km
- Open today
- 0 km
- Under construction
- 13 km
- Sections
- 1
- Cost on record
- €1.4B
- 1 of 1 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Section A: Alsos Veikou – Goudi Contract duration converted from days: 2,920 days. Attiko Metro issued stage B tender documents on 6 September 2018 to three pre-selected consortia, with a €1,510 million budget and an 8-year build; bids were due on 15 March 2019. Financial offers were opened on 19 October 2020: AVAX – Ghella – Alstom bid €1,158 million excluding VAT and Aktor – Ansaldo – Hitachi €1,180 million. The contract, signed on 22 June 2021 (shares AVAX 47%, Ghella 25%, Alstom 28%), covers final and detailed design, civil works, electromechanical and railway systems, 20 driverless trains, maintenance, and a new control centre and train workshop at Sepolia depot. The tender specified about 10,307 m of twin-track tunnel bored by at least two TBMs, from shafts at Veikou and Katechaki, plus about 850 m of single-track tunnel. Archaeology and utility diversions were let separately to ERETVO on 29 March 2021 for €33.5 million, raised to €35.6 million in September 2023. TBM Athina left Katechaki in summer 2023 and reached Evangelismos on 12 February 2026 after about 5,118 m. TBM Niki left Alsos Veikou in 2024 and was halted on 8 May 2026, after passing under Kypseli square towards Dikastiria, when ground movement exceeded design predictions. In February 2026 Elliniko Metro moved the completion deadline from 20 June 2029 to 3 September 2032, against the contractor's proposed 13 February 2034, and demanded repayment of an early-completion premium; the contractor contests both. In April 2026 the Goudi and Evangelismos station sites had still not been handed over. | Under construction 63 of 96 contracted months | 13 km |
|
|
|
| 96 mo total · Contract value €1.2B |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- Loan13 km1 section
- 30-year European Investment Bank loan of €730 million for Section A
- European Union13 km1 section
- Co-financed by the EU through Greece's NSRF 2014–2020 (ESPA)
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA5 Ionia Odos (Antirrio – Ioannina)Same contractor: AVAX
- HighwaysA8 Olympia Odos MotorwaySame contractor: AVAX
- BridgesRio – Antirrio Bridge (Charilaos Trikoupis Bridge)Same contractor: AVAX
- RailwaysBrașov – Sighișoara railway rehabilitation (Corridor IV)Same contractor: Alstom
- RailwaysCluj-Napoca – Oradea – Episcopia Bihor railway rehabilitationSame contractor: Alstom
- RailwaysFrontieră – Curtici – Simeria railway rehabilitation (Corridor IV)Same contractor: Alstom
Sources
- Wikipedia: Line 4 (Athens Metro)read Sep 28, 2026
- Βικιπαίδεια: Γραμμή 4 (Μετρό Αθήνας)read Sep 28, 2026
- Elliniko Metro: Tendering, Line 4 Section A "Alsos Veikou – Goudi" facts sheet (budget €1,510,000,000.00, construction period 8 years)read Sep 28, 2026
- Elliniko Metro: General description of Line 4 (Section A: Alsos Veikou – Goudi, 12.8 km long, with 15 stations)read Sep 28, 2026
- Elliniko Metro: Υπεγράφη στις 22 Ιουνίου 2021 η σύμβαση έναρξης εργασιών για την κατασκευή της Γραμμής 4 (συμβατικό τίμημα περίπου 1,2 δισ. ευρώ συν ΦΠΑ, διάρκεια 8 χρόνια)read Sep 28, 2026
- Ypodomes.com: Η κοινοπραξία ΑΒΑΞ – Ghella – Alstom μειοδότησε για τη νέα Γραμμή 4 του Μετρό (19 October 2020)read Sep 28, 2026
- Ypodomes.com: Την Τρίτη 22 Ιουνίου υπογραφές για τη Γραμμή 4 του Μετρό της Αθήνας ("1,158 ... ευρώ (ποσό χωρίς ΦΠΑ)", 18 June 2021)read Sep 28, 2026
- Ypodomes.com: Μετρό Αθήνας: Για το 2032 μετατέθηκε η ολοκλήρωση της Γραμμής 4 (from 20/06/2029 to 03/09/2032, 2 April 2026)read Sep 28, 2026
- Kathimerini: Athens metro line 4 faces yet another delay (9 April 2026)read Sep 28, 2026
- Elliniko Metro: Γραμμή 4, ανακοίνωση για την αναστολή του TBM Νίκη από 08/05/26read Sep 28, 2026
- European Investment Bank: New Athens metro line to ease commutes and cut emissions with €730 million EU bank loan (25 March 2022)read Sep 28, 2026
- Alstom: Alstom consortium selected for first section of Athens Metro Line 4 (5 November 2020)read Sep 28, 2026
- OpenStreetMap contributors: route geometry (ODbL)read Sep 28, 2026
Figures last checked against their sources in Sep 28, 2026.