Railway line 202 Gdynia Chylonia – Słupsk (modernisation)

Modernisation of railway line 202 between Gdynia Chylonia and Słupsk, split at Lębork. The contracted Gdynia Chylonia – Lębork section adds tracks and upgrades the existing line. Works on Lębork – Słupsk are under way, including a second track. PLK's works at Słupsk station are a separate contract and are not mapped as a separate lot.

Total length
110 km
Open today
0 km
Under construction
54 km
Sections
2
Cost on record
€617.402M
1 of 2 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of Railway line 202 Gdynia Chylonia – Słupsk (modernisation): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Gdynia Chylonia – Lębork

The works contract covers the existing line from Gdynia Chylonia to Lębork. PLK describes 55 km of track works. Its 2026/2027 track-closure schedule gives the section as km 25.200–81.150, a 55.95 km chainage span; the sourced chainage is used. The package adds a second track between Gdynia Chylonia and Rumia and between Wejherowo and Lębork, plus two suburban tracks between Rumia and Wejherowo. PLK planned completion in 2029; ZUE states a contract duration of 56 months. The OSM line drawn is 53.4 km, about 5% shorter than the chainage span, so the sourced length is kept.

Tendered56 km
  1. Dec 16, 2025Tender awarded
  2. ≈2030Expected openingProjected from contract
––
  • ZUE S.A.Builder
56 mo execution · Contract value zł2.6B
Lębork – Słupsk

CUPT gives the line 202 works as km 81.150–135.100, 53.950 km, and states that the completed line will be double track. PLK reported construction under way on the Lębork – Słupsk section in July 2025 and named Intercor as the contractor. Works at Słupsk station are a separate PLK contract with Torpol and are not split into another mapped lot. The OSM line drawn is 51.2 km, about 5% shorter than the sourced chainage, which is kept. No award date for the Intercor package was found, so its contract value is not recorded.

Under construction54 km
  1. 2023Construction start
––
  • Intercor Sp. z o.o.Builder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. PKP PLK: Miliardy na lepszą kolej z Trójmiasta do Słupska (16.12.2025)read Oct 13, 2026
  2. ZUE S.A. current report 36/2025: Gdynia Chylonia – Lębork contract (16.12.2025)read Oct 13, 2026
  3. PKP PLK: Kolej w Słupsku zyskuje nowe oblicze (31.07.2025)read Oct 13, 2026
  4. CUPT: Umowa FEnIKS, Prace na linii kolejowej nr 202 na odcinku Gdynia Chylonia – Słupsk – faza IIread Oct 13, 2026
  5. PKP PLK: Sieciowy harmonogram zamknięć torowych, rozkład jazdy 2026/2027read Oct 13, 2026
  6. OpenStreetMap relation 2345694: railway line 202 Gdańsk Główny – Stargard, route geometry (ODbL)read Oct 13, 2026
  7. OpenStreetMap contributors: copyright and ODbL attributionread Oct 13, 2026

Figures last checked against their sources in Oct 13, 2026.