Aktio – Preveza Undersea Tunnel
Road tunnel under the mouth of the Ambracian Gulf, between Aktio and Preveza in western Greece. It is 1,570 m long: a 909 m immersed section, with 509 m of cut and cover on the Preveza side and 152 m on the Aktio side. The contract was awarded in 1995 and the tunnel was inaugurated on 28 June 2002. It is tolled.
- Total length
- 2 km
- Open today
- 2 km
- Sections
- 1
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Aktio – Preveza undersea tunnel Wikipedia (English) gives the toll as EUR 3 as of January 2026. Cost sources disagree and none states an outturn: English Wikipedia gives an approximate construction cost of EUR 90 million, Greek Wikipedia a project budget of EUR 58,904,232.13, so no cost is recorded. Length measured from the OpenStreetMap way is about 1.74 km because it includes the approach ramps; the recorded 1,570 m is sourced. | Opened | 2 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Sources
- Wikipedia: Aktio–Preveza Undersea Tunnelread Oct 9, 2026
- Greek Wikipedia: Υποθαλάσσια σήραγγα Πρέβεζας - Ακτίουread Oct 9, 2026
- OpenStreetMap contributors (geometry, ODbL), way 322866174read Oct 9, 2026