Attiki Odos Construction JV

Greece
Sections
10
Length
69 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

SectionCountryStatusLengthOpenedSlip
A6 Attiki Odos / Elefsina – MetamorfosiGreeceOpened23 kmNov 2003–
A6 Attiki Odos / Metamorfosi – Kymis AvenueGreeceOpened3 kmJan 2001–
A6 Attiki Odos / Kymis Avenue – Kifisias AvenueGreeceOpened2 kmNov 2003–
A6 Attiki Odos / Kifisias Avenue – GerakasGreeceOpened6 kmJan 2003–
A6 Attiki Odos / Gerakas – Athens AirportGreeceOpened19 kmMar 2001–
A6 Attiki Odos / Airport interchange – MarkopouloGreeceOpened1 kmJul 2002–
A6 Attiki Odos / A62 Hymettus Ring: Katechaki – Glyka NeraGreeceOpened8 kmSep 2003–
A6 Attiki Odos / A62 Hymettus Ring: Glyka Nera – LeontarioGreeceOpened3 kmJul 2002–
A6 Attiki Odos / A62 Pallini bypass: Leontario – PalliniGreeceOpened2 kmAug 2004–
A6 Attiki Odos / A621: Agia Paraskevi – Doukissis PlakentiasGreeceOpened3 kmApr 2004–

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.