China Overseas Engineering Group
Poland
Name variants are not merged
Unregistered spelling
- Sections
- 2
- Length
- 73 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki) / Łódź Północ – Skierniewice | Poland | Opened | 32 km | Jun 2012 | – |
| A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki) / Skierniewice – Grodzisk Mazowiecki | Poland | Opened | 41 km | Jun 2012 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.