China Railway International Co. Ltd.

Serbia
Sections
2
Length
143 km
Median slip
+8 mo
Median overrun
–

Slip measured on 2 of 2 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.