Dálniční stavby Praha
Czechia
Name variants are not merged
Unregistered spelling
- Sections
- 2
- Length
- 12 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| D0 Prague Ring Road (Pražský okruh) / D1 (Modletice) – Vestec (512) | Czechia | Opened | 9 km | Sep 2010 | – |
| D0 Prague Ring Road (Pražský okruh) / Třebonice – Řepy (516) | Czechia | Opened | 3 km | Aug 2000 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.