PBDI
Poland
Name variants are not merged
Unregistered spelling
- Sections
- 2
- Length
- 15 km
- Median slip
- +28 mo
- Median overrun
- –
Slip measured on 1 of 2 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| S3 expressway (Świnoujście – Szczecin – Zielona Góra – Legnica – Lubawka) / Kamienna Góra Północ – Lubawka | Poland | Opened | 12 km | Sep 2023 | +28 mo |
| S3 expressway (Świnoujście – Szczecin – Zielona Góra – Legnica – Lubawka) / Lubawka – Czech border | Poland | Tendered | 3 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.