PSVS

Czechia

Name variants are not merged

Unregistered spelling

Sections
2
Length
12 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

SectionCountryStatusLengthOpenedSlip
D0 Prague Ring Road (Pražský okruh) / D1 (Modletice) – Vestec (512)CzechiaOpened9 kmSep 2010–
D0 Prague Ring Road (Pražský okruh) / Třebonice – Řepy (516)CzechiaOpened3 kmAug 2000–

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.