← All contractors
VPÚ DECO PRAHA a.s.
Czechia
Name variants are not merged
Unregistered spelling
- Sections
- 0
- Length
- 0 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
–
Other roles
Credited to this firm, counted nowhere above.
- D8 motorway (Praha – Lovosice – Ústí nad Labem – German border) / Zdiby – Úžice (0801)Designer
- D8 motorway (Praha – Lovosice – Ústí nad Labem – German border) / Úžice – Nová Ves (0802)Designer
- D8 motorway (Praha – Lovosice – Ústí nad Labem – German border) / Nová Ves – Doksany (0803)Designer
- D8 motorway (Praha – Lovosice – Ústí nad Labem – German border) / Doksany – Lovosice (0804)Designer
- D8 motorway (Praha – Lovosice – Ústí nad Labem – German border) / Řehlovice – Trmice (0806)Designer
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.