Lithuania
as of Oct 2026
- Total open
- 73 km#17 / 22
- Under construction
- 7 km#19 / 19
- Planned
- 0 km
- Projects
- 1
km per 1,000 km²: 1.1#14 / 22km per million people: 25.2#15 / 22
Measured against 65,300 km² and 2,890,700 inhabitants (Jan 2026).
By category
Highways
73 km#14 / 21
building 7 km
6 sections
Network growth
Busiest decade: the 2020s, with 40 km opened.
| km | Highways | |
|---|---|---|
| 2010s | 33 km | 33 km |
| 2020s | 40 km | 40 km |
2010
2020
Highways
Mapped sections
Loading map data…
Delivery record
Cost and schedule outcomes for this country's sections, measured exactly as on the performance page.
- Median slip
- –n=0
- On time
- –
- Median overrun
- –n=0
- Sections
- 6
Furthest behind schedule
–
Delivered on time or early
No section here opened on or before its contract date.
Largest cost overruns
No section here records both an estimate and a final cost.
At or under budget
No section here came in at or under its estimate.
Openings timeline
Past openings
- Dec 2025A5 Kaunas–Polish border / 85.000–97.060 km (Marijampolė–Polish border, stage IV)12 km
- Oct 2024A5 Kaunas–Polish border / 56.830–72.500 km (Marijampolė–state border, stage III)16 km
- Dec 2023A5 Kaunas–Polish border / 79.000–85.000 km (Marijampolė–state border, stage II)6 km
- Oct 2023A5 Kaunas–Polish border / 72.500–79.000 km (Marijampolė–state border, stage I)6 km
- Nov 2018A5 Kaunas–Polish border / 23.320–56.830 km (Mauručiai–Marijampolė)33 km
Projects in Lithuania
Sources
- CIA World Factbook 2025 (final edition), Lithuania, Geography: Area (total 65,300 sq km), via factbook.json
- Eurostat: Population change, demographic balance and crude rates at national level [demo_gind], Lithuania, population on 1 January 2026 (2,890.7 thousand)
Sources for area and population only. Every project cites its own sources on its page.