Athens
GreeceEverything built inside Athens: metro lines, urban bridges and the rest. These projects are shown here rather than on the main map, where at country zoom they would be a few pixels on top of the motorway network.
The city network
Solid lines are open. Dashed lines are building or planned. Zoom in to reach individual stations.
Projects
Sources
Population is the Municipality of Athens (Dimos Athinaion), 643,452 permanent residents at the 2021 census, reference date 22 October 2021. GDP per capita is for NUTS 3 region EL303 Kentrikos Tomeas Athinon, the Central Athens regional unit: the municipality plus seven neighbouring ones, 1,002,212 people at the same census. The GDP figure is therefore spread over about 56% more people than the population field counts. Eurostat flags the 2023 value as provisional.
Hellenic Statistical Authority (ELSTAT): 2021 Population-Housing Census, permanent population results (index of published tables), ELSTAT, 2021 census, MON_PLI_DHM_OIKISN_2021.xlsx: Permanent population by settlement (Dimos Athinaion: 643,452; Periferiaki Enotita Kentrikou Tomea Athinon: 1,002,212), Eurostat: Gross domestic product (GDP) at current market prices by NUTS 3 region [nama_10r_3gdp], unit EUR_HAB, geo EL303 Kentrikos Tomeas Athinon, 2023 (provisional).