Bechtel International

Romania

Name variants are not merged

Unregistered spelling

Sections
2
Length
54 km
Median slip
Median overrun

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

SectionCountryStatusLengthOpenedSlip
A3 Transylvania Motorway (Brașov–Cluj–Borș) / Gilău (Cluj West) – TurdaRomaniaOpened42 kmDec 2009
A3 Transylvania Motorway (Brașov–Cluj–Borș) / Turda – Câmpia TurziiRomaniaOpened12 kmNov 2010

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.