← All contractors
Bilfinger Berger
Romania
Name variants are not merged
Unregistered spelling
- Sections
- 1
- Length
- 48 km
- Median slip
- –
- Median overrun
- +33.4%
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| CFR Line 300 rehabilitation, Rhine–Danube Corridor (Câmpina–Predeal and Coșlariu–Sighișoara) / Câmpina – Predeal | Romania | Opened | 48 km | Dec 2011 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.