Bouygues TP
Hungary
- Sections
- 2
- Length
- 60 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- M5 Construction Group
- M5 Phase 3 Contractors
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| M5 motorway (Budapest – Kecskemét – Szeged – Röszke) / Kiskunfélegyháza – Szeged-észak | Hungary | Opened | 46 km | Dec 2005 | – |
| M5 motorway (Budapest – Kecskemét – Szeged – Röszke) / Szeged-észak – Röszke (Serbian border) | Hungary | Opened | 15 km | Mar 2006 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.