Budimex Kolejnictwo
Poland
- Sections
- 2
- Length
- 28 km
- Median slip
- −3 mo
- Median overrun
- –
Slip measured on 2 of 2 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Podłęże – Piekiełko new line and line 104 Chabówka – Nowy Sącz rebuild / Line 622 Podłęże – Gdów (new line) | Poland | Tendered | 20 km | – | 0 mo |
| Podłęże – Piekiełko new line and line 104 Chabówka – Nowy Sącz rebuild / Line 622 Szczyrzyc – Tymbark (new line) | Poland | Under construction | 8 km | – | −5 mo |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.