← All contractors
Budpol
Poland
- Sections
- 2
- Length
- 30 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A1 motorway (Rusocin – Toruń – Łódź – Częstochowa – Gliwice – Gorzyczki) / Rząsawa – Częstochowa Blachownia | Poland | Opened | 20 km | Dec 2019 | – |
| A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki) / Kijowiec – Dobryń | Poland | Tendered | 9 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.