Skip to content
InfraWorldWide
← All contractors

Comtram

Romania

Name variants are not merged

Unregistered spelling

Sections
1
Length
18 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Too few sections to rank. The figures below describe the work; they are not a track record.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Geiger – Max Bögl – Comtram

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
A1 Bucharest–Nădlac Motorway / Sibiu bypassRomaniaOpened18 kmDec 2010–

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.