← All contractors
Dömper
Hungary
- Sections
- 4
- Length
- 26 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| M85 expressway (Győr – Csorna – Sopron – Austrian border) / Nagylózs – Sopron-kelet | Hungary | Opened | 15 km | Dec 2020 | – |
| M85 expressway (Győr – Csorna – Sopron – Austrian border) / Sopron-kelet – Balf | Hungary | Opened | 3 km | Jun 2021 | – |
| M85 expressway (Győr – Csorna – Sopron – Austrian border) / Balf – Fertőrákos | Hungary | Opened | 4 km | Dec 2021 | – |
| M85 expressway (Győr – Csorna – Sopron – Austrian border) / Fertőrákos – Sopron (Austrian border), incl. Sopron tunnel | Hungary | Opened | 4 km | Dec 2024 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.