GCF Generale Costruzioni Ferroviarie S.p.A.
Kosovo
Name variants are not merged
Unregistered spelling
- Sections
- 2
- Length
- 101 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Railway Route 10 rehabilitation / Fushë Kosovë–Hani i Elezit, Phase 1 | Kosovo | Under construction | 67 km | – | – |
| Railway Route 10 rehabilitation / Fushë Kosovë–Mitrovicë, Phase 2 | Kosovo | Under construction | 34 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.