Geostroy
Bulgaria
- Sections
- 3
- Length
- 20 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- Obedinenie Geopat Lot 1
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Montana – Botevgrad Expressway (I-1 / E79) / Lyutidol – Novachene (Lot 1, western part) | Bulgaria | Under construction | 11 km | – | – |
| Montana – Botevgrad Expressway (I-1 / E79) / Novachene – Skravena (Lot 1, opened part) | Bulgaria | Opened | 8 km | Apr 2023 | – |
| Montana – Botevgrad Expressway (I-1 / E79) / Skravena – Botevgrad interchange (Lot 1, eastern part) | Bulgaria | Under construction | 2 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.