Granvia Construction
Slovakia
- Sections
- 4
- Length
- 51 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| R1 expressway (Trnava – Nitra – Žiar nad Hronom – Zvolen – Banská Bystrica) / Nitra západ – Selenec | Slovakia | Opened | 13 km | Oct 2011 | – |
| R1 expressway (Trnava – Nitra – Žiar nad Hronom – Zvolen – Banská Bystrica) / Selenec – Beladice | Slovakia | Opened | 19 km | Oct 2011 | – |
| R1 expressway (Trnava – Nitra – Žiar nad Hronom – Zvolen – Banská Bystrica) / Beladice – Tekovské Nemce | Slovakia | Opened | 14 km | Oct 2011 | – |
| R1 expressway (Trnava – Nitra – Žiar nad Hronom – Zvolen – Banská Bystrica) / Banská Bystrica northern bypass | Slovakia | Opened | 5 km | Jul 2012 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.