Hídépítő
Hungary
- Sections
- 2
- Length
- 18 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- M0 Északi Duna-híd konzorcium
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| M0 Budapest ring road / North sector: Road 2 – Road 11 (Megyeri Bridge) | Hungary | Opened | 4 km | Sep 2008 | – |
| M7 motorway (Budapest – Lake Balaton – Nagykanizsa – Letenye) and M70 spur / Zamárdi – Balatonszárszó (Kőröshegy viaduct) | Hungary | Opened | 14 km | Aug 2007 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.