← All contractors
Hidroelektra
Croatia
Name variants are not merged
Unregistered spelling
- Sections
- 2
- Length
- 20 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A11 Zagreb – Velika Gorica – Lekenik – Sisak / Velika Gorica jug – Buševec | Croatia | Opened | 9 km | May 2009 | – |
| A11 Zagreb – Velika Gorica – Lekenik – Sisak / Buševec – Lekenik | Croatia | Opened | 11 km | Apr 2015 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.