Hydroekol Dolný Kubín

Slovakia
Sections
1
Length
4 km
Median slip
+25 mo
Median overrun
–

Slip measured on 1 of 1 sections built.

No section this firm built records both an estimate and a final cost.

Too few sections to rank. The figures below describe the work; they are not a track record.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

SectionCountryStatusLengthOpenedSlip
R3 expressway (Orava and Turiec sections) / Tvrdošín – NižnáSlovakiaOpened4 kmJul 2025+25 mo