Skip to content
InfraWorldWide
← All contractors

Kamgrad

Croatia
Sections
3
Length
24 km
Median slip
+20 mo
Median overrun
–

Slip measured on 2 of 3 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.