Kolektor CPG
Croatia
- Sections
- 2
- Length
- 19 km
- Median slip
- +25 mo
- Median overrun
- –
Slip measured on 1 of 2 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A7 Motorway (Rupa – Rijeka – Žuta Lokva) / Jadranovo – Selce | Croatia | Tendered | 12 km | – | – |
| A7 Motorway (Rupa – Rijeka – Žuta Lokva) / Selce – Novi Vinodolski (bypass) | Croatia | Under construction | 7 km | – | +25 mo |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.