← All contractors
M CONCESSIONS
Greece
- Sections
- 1
- Length
- 13 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- AVAX – MYTILINEOS – M CONCESSIONS consortium
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Thessaloniki Flyover (Eastern Inner Ring Road upgrade, K5 – K12) / Eastern Inner Ring Road: junction K5 – junction K12 | Greece | Under construction | 13 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.