Makyol Insaat Sanayi ve Ticaret A.S.
Romania
Name variants are not merged
Unregistered spelling
- Sections
- 4
- Length
- 68 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A13 Motorway (Carpathian Motorway) / Lot 1: Boița – Avrig – Mârșa | Romania | Under construction | 14 km | – | – |
| A13 Motorway (Carpathian Motorway) / Lot 2: Mârșa – Arpașu de Jos | Romania | Under construction | 20 km | – | – |
| A13 Motorway (Carpathian Motorway) / Lot 3: Arpașu de Jos – Sâmbăta de Sus | Romania | Under construction | 18 km | – | – |
| A13 Motorway (Carpathian Motorway) / Lot 4: Sâmbăta de Sus – Făgăraș | Romania | Under construction | 16 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.