Metroprojekt Praha

Bulgaria
Sections
2
Length
6 km
Median slip
+1 mo
Median overrun
–

Slip measured on 1 of 2 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Metro Cherni Vrah 2013 consortium
  • Stanilov – Metroprojekt consortium

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

Other roles

Credited to this firm, counted nowhere above.

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.